Project WBS – WORK BREAKDOWN STRUCTURE

Project WBS - WORK BREAKDOWN STRUCTURE

DESIGN A WBS STRUCTURE

  • WBS: Develop a WBS decomposition of the project scope based on the project charter submitted in assignment #1 ( Marriott Hotel Bedding) 
  • Use WBS best practices to create a clear, concise, traceable artifact, i.e., nouns, WBS numbers, high-level work deliverables, sub-components, and work packages. Refer to the WBS coursebook for layout guidance. (Submit 1-page maximum). Reminder:  Add a properly formatted cover page as specified in the syllabus. The cover page is part of the rubric score point calculation.

Note:  Refer to the Bicycle exemplar for the WBS structure and format. Add a numbering scheme per the assigned textbook Project Management Work Breakdown Structures. 

Formatting:

  • The WBS should fit and print on one page and be readable and professional. 
  • MS PowerPoint SmartArt, Visio, Word, or similar image graphic is acceptable.